RECENT PROJECTS

crystal
4
3
2

CRYSTAL LODGE WHISTLER

 

LOCATION: 4154 Village Green, Whistler

 

DURATION: 2 months

 

PROJECT SCOPE: Guest room upgrades including complete bathroom renovation and guest suite wall coverings. AC units installed in guest suites from exterior.

 

UNIQUE REQUIREMENTS: Very tight timeline (more than 10 rooms completed per week with a large scope). Working alongside electricians, plumbers, HVAC installers and hotel staff to accommodate the tight schedule. Working with the building inspectors of Whistler to upgrade the aged hotel to meet modern building code.

 

Library
IMG_1295
IMG_1293
IMG_1376
las page3
lib1
IMG_1294

VANCOUVER CENTRAL LIBRARY

 

LOCATION: 350 W Georgia Street, Vancouver

 

DURATION: 2 months

 

PROJECT SCOPE: Removed, prepared and replaced all exterior sealant on building in all interfaces between window frames, concrete and pre-cast concrete structural elements, panels, building penetrations and joints. 

 

UNIQUE REQUIREMENTS: Working at extreme heights with many operating businesses and heavy pedestrian traffic below.

WORKSAFEBC HEAD OFFICE

 

LOCATION: 224 W Esplanade, North Vancouver

 

DURATION: 5 months

 

PROJECT SCOPE: Cleaned exterior walls, windows, skylights and blinds. Pressure washed exterior concrete and applied silane/siloxane concrete sealer. Removed existing stucco finish coat and installed parapet flashings and new acrylic finish coat system.

 

UNIQUE FEATURES: Having worked at the WorkSafeBC building we are fully capable and familiar with regulations, creating and maintaining the correct paperwork and ensuring our teams are consistently following plans and regulations.

 

ICBC Head Office
Jonathan 162_edited
Jonathan 165_edited

ICBC HEAD OFFICE

 

LOCATION: 151 West Esplanade, North Vancouver

 

DURATION: 3 months

 

PROJECT SCOPE: Hand-washed all exterior surfaces including white superstructures and blue tiles as well as complete interior painting and wallpaper hanging.

 

UNIQUE REQUIREMENTS: Working at government facilities requires strict regulations and attention to detail. Proper safety procedures where followed at all times while working at extreme heights with heavy pedestrian traffic below.

 

four seasons
lobby
room
room2
bathroom

FOUR SEASONS HOTEL

 

LOCATION: 791 W Georgia St. Vancouver

 

DURATION: 7 months and on going

 

PROJECT SCOPE: Complete interior upgrade including guest rooms, guest hallways and meeting rooms. 

 

UNIQUE FEATURE: Used level 5 finish to all texture ceilings. We had to complete each floor on time, completely one per week by Friday at 4pm.

 

fabrics
fabrics2

FABRICS ETC.

 

LOCATION: 2161 Kingsway, Vancouver

 

DURATION: 2 months

 

PROJECT SCOPE: Demolition of structures within the retail and warehouse spaces. Electrical installations of lighting systems and new wiring for plugs. Concrete cutting as well as framing and drywalling for new office spaces. Floor finishing with an epoxy coating and painting of the entire retail and warehouse space.

 

UNIQUE REQUIREMENTS: Installed a wheel chair ramp with guardrail and ribbed rubber flooring that complied with city code. Worked around the business's hours and completed renovation within requested time frame and budget.

 

62A_9199_200_201Adjusthixm
62A_9193_4_5Adjusthixm
62A_9190_1_2Adjusthixm
IMG-20151026-231534

HOLIDAY INN METROTOWN

 

LOCATION: 4405 Central Blvd, Burnaby

 

DURATION: 4 months and ongoing

 

PROJECT SCOPE: Interior lobby renovation including demolition, tile flooring, electrical work, cabinet and desk installation and interior painting. We also power washed and repainted entire exterior of hotel. 

 

UNIQUE REQUIREMENTS: Renovations were complete while the hotel continued operations and the job was completed on time and within the allocated schedule provided by the hotel.

 

IMG_1174
nissan

JONKER AUTO GROUP

 

LOCATION: 19515 Langley Bypass, Surrey

 

DURATION: on going

 

PROJECT SCOPE: Completed a number of projects at both Honda and Nissan Jonker dealerships. Work ranged from demolition, drywall construction, rust repair and interior/exterior painting.

 

UNIQUE REQUIREMENTS: Completed projects around the schedule of the busy dealerships, extra precautions had to be taken while completing work around the dealerships inventory.

 

Holiday Inn Broadway
Holiday Inn
capture2
Holiday Inn Parkade 017

HOLIDAY INN VANCOUVER CENTRE

 

LOCATION: 711 West Broadway, Vancouver

 

DURATION: 7 months and on going

 

PROJECT SCOPE: Complete interior upgrade including guest rooms and hallways, all ballrooms, lobbies, meeting rooms, restaurant and lounge areas. Also completed exterior painting and concrete restoration on building and parking garage.

 

UNIQUE REQUIREMENTS: All textured ceilings skim coated to a level 5 smooth finish. Working alongside electricians and plumbers as the building was refurbished for sprinklers and new fire alarm system. Renovation of lobby while hotel continued operations.

 

113-6741 Cariboo Road     Burnaby, BC     V3N 4A3    604.876.3305    info@prostar.ca
Servicing: Vancouver, Richmond, Surrey, Langley, Aldergrove, Mission,
Abbotsford, Maple Ridge, Pitt Meadows, Tricities, Port Moody, Coquitlam
Whistler, Burnaby, New Westminster, North Vancouver, West Vancouver,
East Vancouver, Lower Mainland, Fraser Valley, Chilliwack, Squamish

Visit our other websites:

  • White Facebook Icon
  • White Instagram Icon
  • White Twitter Icon
  • White LinkedIn Icon
  • White Yelp Icon
Jonathan 165_edited